Information for Land South-West of Blunts Farm and near Uddens Industrial Estate, Ferndown, Dorset

Status: Potential
Planning Region: South West
Planning Sub-Region: Dorset
Operator: Unknown
Capacity: Circa 200,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: It was reported in June 2016 that "council planners are now considering a wider area south west of [Blunts Farm] for...a residual waste treatment site..." as part of their waste plan consultation, and locals believe this could result in an incinerator being built in their area [Source, Source, Source]. (Entry updated 2016-08-10)

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.