Information for Canford Low-Carbon Energy Facility (LowCEF), Magna Road, Poole

Status: Potential
Planning Region: South West
Planning Sub-Region: Dorset
Operator: Syngas Products (formerly owned by New Earth Energy Ltd)
Capacity: 10,000 (with plans to increase to 100,000)
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Proposed gasification/pyrolysis-type incinerator intended to process a feedstock derived from waste obtained planning permission November 2013 [Source, Source, Source]. A demonstrator plant previously operated at the site, and this was granted planning consent in September 2009. Intended to treat RDF. (Entry updated 2017-01-18)

Entry on WikiWaste:

https://wikiwaste.org.uk/index.php?title=Canford

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.