Information for Unit 7, Northedge Business Park, Alfreton Road

Status: Prevented
Planning Region: East Midlands
Planning Sub-Region: Derby
Operator: Envirofusion Ltd
Capacity: 5,000
Campaign Group(s): Oppose the Alfreton Road Incineratorand Derby FoE and Sinfin and Spondon Against INcineration (SSAIN) [Also see Simon’s blog]
Notes: In September 2018 it was announced by local campaigners that Envirofusion had given up on this project [Source]. In October 2016 a planning application was submitted for "Temporary consent (18 months) for...a pyrothermic [converter] utilising RDF" (ref 10/16/01241). According to the Planning Statement, the facility will be dismantled following 12 months of trials. The project was announced in May 2013, with the company being established in 2012 [Source]. The developer describes the process as "Advanced Thermal Treatment", and the technology could be a form of pyrolysis/gasification hybrid. In October 2017 planning permission was granted [Source, Source]. (Entry updated 2018-09-13)

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.