Incinerator information library

Information for CBP East, Plot 5, Cornwall Bio Park, Land At Hallenbeagle, Sawmills Lane, Scorrier, Redruth

Status: Prevented
Planning Region: South West
Planning Sub-Region: Cornwall
Operator: Green EfW Investments Ltd
Capacity: 40,000 - 70,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Planning consent issued on the 6th of November 2012, with application submitted in July 2012 [See planning application (ref. PA12/06846)]. Intended to derive 40,000 tonnes of RDF for on-site gasification from 70,000 tonnes of Cornwall’s commercial waste [Source]. Last known activity was an application for a Non Material Amendment in October 2014 (PA14/09431), and on the 1st of November 2016 a notice was made for compulsory strike-off of GreenEfW Investments Limited and GreenEfW Cornwall Limited [Source]. Redruth EfW was awarded a CfD by BEIS in September 2017 but it is unclear whether it is related to this site [Source]. (Entry updated 2017-09-14)

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.