Menu Close

Incinerator information library

Information for Ellesmere Port Incinerator, Bridges Road, Ellesmere Port, Wirral

Status: Existing
Planning Region: North West
Planning Sub-Region: Cheshire
Operator: Veolia ES Cleanaway (UK) Limited [See annual report]
Capacity: 100,000
Campaign Group(s): CHeshire Anti-Incinerator Network (CHAIN)
Notes: Permitted to incinerate a wide range of hazardous and non-hazardous wastes.Tonnes burned: 86,380 (2006); 91,905 (2007); 82,372 (2008); 85,000 (2009); 92,752 (2010). (Entry updated 2010-11-25)