Information for Storage Boost Ltd, Weston Centre, Weston Road, Crewe

Status: Prevented
Planning Region: North West
Planning Sub-Region: Cheshire East
Operator: OSL
Capacity: 9,180
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Planning application submitted in May 2016 and withdrawn in September 2016 (ref. 16/2196W) for 5 year temporary permission for a batch gasification/pyrolysis process (OSL/Enerj-8 I8-1000) intended to burn a mixed domestic waste (including railway waste) and MRF rejects. (Entry updated 2020-02-19)

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.