Information for Slough Multifuel, 342 Edinburgh Avenue, Slough Trading Estate, Slough

Status: Potential
Planning Region: South East
Planning Sub-Region: Berkshire
Operator: Slough Heat and Power Ltd
Capacity: 558,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: In October 2018 SSE stated that they had begun decomissioning work for their old Combined Heat and Power Plant and that they had obtained planning permission for it to be replaced with a "new Multifuel facility" [Source]. In 2018 they expected construction works to commence in 2019 and to continue for approximately 3 years. According to the SSE website: "The facility will produce electricity and heat through burning waste-derived fuels made from various sources of municipal solid waste, commercial and industrial waste, and waste wood" [Source]. In April 2020 it was announced that SSE had sold a 50% stake in the project to Copenhagen Infrastructure Partners [Source]. A permit for the plant was issued 2016 (EPR/CP3031SX). (Entry updated 2020-05-29)

Waste management for England 2018: Operational (Environment Agency)

Uses data from Waste Data Interrogator 2018 - 2018 Waste Summary Tables for England - Version 2 released by the Environment Agency under the Open Government License

PermitDate PermittedOperator NameSite NameSite AddressFormer Planning RegionFormer Planning Sub-RegionEA AreaTypePermitted Capacity (tonnage)Tonnage Incinerated in 2006Tonnage Incinerated in 2007Tonnage Incinerated in 2008Tonnage Incinerated in 2009Tonnage Incinerated in 2010Tonnage Incinerated in 2011Tonnage Incinerated in 2012Tonnage Incinerated in 2013Tonnage Incinerated in 2014Tonnage Incinerated in 2015Tonnage Incinerated in 2016Tonnage Incinerated in 2017Tonnage Incinerated in 2018Comment
CP3031SX21/12/2006Slough Heat and Power LtdSlough342, Edinburgh Avenue, Trading Estate, Slough, Berkshire SL4 6BPSouth EastBerkshireWest ThamesBiomass - Waste wood547,500-207,877173,872184,000145,053182,000157,980123,00089,00098,000115000 111000 111,418

Environment Agency 2018 Pollution Inventory: Substances

Uses data from the Pollution Inventory 2018 released by the Environment Agency under a special license

PermitEA AREA NAMEROUTE NAMESUBSTANCE NAMEREPORTING THRESHOLD (kg)QUANTITY RELEASED (kg)REGULATED INDUSTRY SECTORREGULATED INDUSTRY SUB SECTOR
CP3031SXThamesAirCarbon monoxide10000038,336.00EfWEfW
CP3031SXThamesAirNitrous oxide10000650EfWEfW
CP3031SXThamesAirNitrogen oxides (NO and NO2) as NO2100000203,948.00EfWEfW
CP3031SXThamesAirArsenic11.15EfWEfW
CP3031SXThamesAirCadmium10.38EfWEfW
CP3031SXThamesAirChromium104.61EfWEfW
CP3031SXThamesAirCopper106.92EfWEfW
CP3031SXThamesAirLead10023.1EfWEfW
CP3031SXThamesAirMercury10.31EfWEfW
CP3031SXThamesAirNickel1011.5EfWEfW
CP3031SXThamesWastewaterArsenic50EfWEfW
CP3031SXThamesWastewaterCadmium10EfWEfW
CP3031SXThamesWastewaterChromium200.03EfWEfW
CP3031SXThamesWastewaterCopper200.01EfWEfW
CP3031SXThamesWastewaterLead200.02EfWEfW
CP3031SXThamesAirChlorine and inorganic chlorine compounds - as HCl100002,683.00EfWEfW
CP3031SXThamesAirFluorine and inorganic fluorine compounds - as HF100065.3EfWEfW
CP3031SXThamesAirNon-methane volatile organic compounds (NMVOCs)10000952.5EfWEfW
CP3031SXThamesAirParticulate matter - PM101000877EfWEfW
CP3031SXThamesAirParticulate matter - PM2.51.00E+03877EfWEfW
CP3031SXThamesAirCarbon Dioxide From Qualifying Renewable Fuel Sources0136,709,000.00EfWEfW
CP3031SXThamesWastewaterMercury0.10EfWEfW
CP3031SXThamesWastewaterNickel200.04EfWEfW
CP3031SXThamesWastewaterZinc1000EfWEfW
CP3031SXThamesAirParticulate matter - total10000877.00EfWEfW
CP3031SXThamesAirSulphur oxides (SO2 and SO3) as SO210000029,195.00EfWEfW
CP3031SXThamesWastewaterPhosphorus - as total P50000.26EfWEfW
CP3031SXThamesAirCarbon dioxide10000000154,483,000.00EfWEfW

Annual Performance Report files:

265-AnnualPerformanceReport-2019.pdf

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.