Information for Upperton Industrial Estate, Peterhead

Status: Prevented
Planning Region: Scotland
Planning Sub-Region: Aberdeenshire
Operator: Buchan Combined Heat and Power Ltd
Capacity: 100,000
Campaign Group(s): Communities Against Toxics Scotland (CATsScotland) and the Aberdeen No Incinerator group
Notes: Planning permission refused in April 2010, and although no appeal was made local campaigners believe there is the possibility that Buchan could come back with a fresh application [source]. (Entry updated 2011-06-30)

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.